Case Studies

You are in
Images in Scone Drainage

 

Scope of works

• Remove level crossing.
• Install pipes.
• Reinstate plus 800m of cess drainage.

Challenges         

• TCP for pedestrians with traffic control personnel.
• Located water main (unidentified on plans) at height of  proposed pipe.

Solutions            

• Lower new pipes and cess drains to suit.
• Extend pipe length through temporary level crossing.