Case Studies
Images in Scone Drainage
Scope of works
• Remove level crossing.
• Install pipes.
• Reinstate plus 800m of cess drainage.
Challenges
• TCP for pedestrians with traffic control personnel.
• Located water main (unidentified on plans) at height of proposed pipe.
Solutions
• Lower new pipes and cess drains to suit.
• Extend pipe length through temporary level crossing.